A busy truck can still be doing work at a loss. Start with the records behind each job before changing your prices.

Two service operators checking a disposal docket beside a parked truck at the depot

A full run sheet tells you the truck was busy. It doesn’t tell you whether the jobs covered the labour, travel and disposal involved. To answer that, connect the work recorded to the revenue billed for it.

Start with a small set of completed jobs you can check properly. A rough total built from guessed times and missing disposal costs can send you towards the wrong pricing decision.

Separate charges and costs

A charge is what you bill the customer. A cost is what your business spends doing the work. Keep the two separate even when you use a markup to set the charge.

For a pump-out, disposal can appear on both sides: the amount paid to the receiving facility and the amount charged to the customer. Recording one doesn’t establish the other. The same applies to materials and labour.

Use revenue and cost figures on a consistent basis for the comparison. Ask the person responsible for the accounts to agree the treatment of tax and overheads before staff start interpreting the result. This guide describes an operational check, rather than a substitute for the business’s accounts.

Capture time as it happens

Record travel and time on site while the visit is fresh. A departure tap at the next property can make one job look slow and the following job look unusually efficient. Give technicians a simple way to correct missed or accidental entries, with a note where the correction needs explaining.

Include every crew member. A two-person visit taking an hour uses more labour than a one-person visit taking an hour. Check that staff rates reflect the cost basis you’ve chosen, then review those rates when the business’s costs change.

Time at the yard, loading, cleaning and other work still uses paid hours. Decide how you’ll account for that outside the individual job comparison. Otherwise the sum of apparently profitable jobs can be hard to reconcile with the week as a whole.

Count the truck and disposal

Record distance and vehicle use in the same way across jobs. Check whether the chosen truck cost rate includes fuel and maintenance before adding them again. The aim is a repeatable comparison, with an explanation another person can follow.

Disposal records need the volume, destination and the cost basis used. When a disposal trip contains material from several jobs, agree how you allocate the shared cost. Don’t attach the whole trip to whichever job happened to be open on the screen.

Treat estimated figures as estimates. A missing docket deserves a follow-up task, and a changed receiving rate needs an updated cost record. Our pump-out quote guide covers carrying those assumptions into the price offered before the visit.

Compare similar work

Review a group of similar jobs before changing a rate. One difficult access visit can distort a tiny sample. Compare the recorded facts: travel, volume, crew time, disposal and materials. Look for the reason behind the difference.

For example, two jobs with the same quoted price might use very different hose access and travel time. That’s a question to investigate, not evidence that the technician on the longer visit performed badly.

Check completed jobs waiting to be invoiced as well. Their costs exist before their billed revenue appears. A report that mixes billed and unbilled work without identifying it can make the period look worse than it is.

Use the result

Turn findings into a specific change you can test: clearer access questions, better run grouping, a revised travel allowance or a different quote for a known difficult site. Record what changed and compare later jobs using the same method.

Rangefront Waste combines crew time, configured vehicle rates, disposal and materials in the job cost view. Its Profit page compares billed work and flags jobs with recorded losses. Rates and missing distance still need attention from your team. Read the time and costing guide for the calculation inputs, and use the invoice checklist to catch work that’s finished but hasn’t yet been billed.

Related guides

All guides

Billing4 min read

What to check before invoicing a septic job

A finished job can still have missing charges, the wrong billing contact or a deposit that needs checking. Use this office review before sending the invoice.

Try it with your own jobs.

Fifteen days free with your customers, your councils and your crew. Add a card to start, and cancel before day 16 if it's not for you.

A vacuum truck pumping out a tank at a rural property